Installation Instructions
1) Remove upper playfield per video included below.
2) Remove screws/washers from spotlights; push spotlights out of the way.
3) Remove 1/2″ hex spacers & washers; set aside for later reinstallation
4) Remove black nuts, and lift off ‘Battle’ and ‘Zone’ plastics.
5) Remove washers atop posts (protecting plastics’ art), and remove rubbers. Set aside for later reinstallation.
6) Remove OEM clear posts and replace with caution posts. ** Hold posts in their optimal orientation for the player’s perspective as you tighten them down. ** (If you don’t hold them, they will rotate as you tighten/secure the screw.
7) Reinstall rubbers, ensuring leaf switch is inside.
8) Reinstall washers atop post screws, then reinstall ‘Battle’ and ‘Zone’ plastics.
9) Install replacement black nuts (with black inserts instead of OEM nuts’ white inserts) at lower post screws. Reinstall OEM washers and hex spacers at upper post screws.
10) Install caution hex sleeves over the hex spacers, again being mindful of their orientation with respect to the art & player’s perspective.
11) Reinstall spotlights, using replacement black washers, lockwashers, and screws.
12) Reinstall upper playfield.
Reviews
There are no reviews yet.